Completed Projects

Sound Proof Steel Sliding Door

“Supply, Fabrication, Erection and Commissioning of Fire Retardant, Sound Proof Steel Sliding Door complete with Top and Bottom Track duly riveted / screwed complete with MS Perforated Sheet on One Side, Rockwool Filling for Sound Proofing wrapped in Fire Retardant Cloth duly Painted”

Completion Date: 01/11/2014

Steel Super Structure Railway Bridge at Marrir Chowk, Rawalpindi.

“Supply, Fabrication, Testing, Erection and Commissioning of Rivetted Steel Super Structure Railway Bridge using Semi Through Plate Girders, R.S Joist, Channels, Angles, Gusset Plates, Stiffeners etc duly Sandblasted and Painted with Two Coats of Red Oxide Primer and Two Coats of Red Oxide Gloss Enamel”

Completion Date:20/06/2014

Light Fixing Panels for Badminton Courts & Gymnasium Building, Islamabad Club

“Supply, Fabrication and Installation of Steel Structure for Light Fixing Panels (Single / Double) Duly Shaped to Required Curvatures. Fabricated from MS Pipe MS Perforated Sheet and MS Plate, Painted with One Coat of Red Oxide Primer and Industrial Synthetic Enamel”

Completion Date: 09/08/2012

Light Fixing Panels for Badminton Courts & Gymnasium Building, Islamabad Club

“Supply, Fabrication and Installation of Steel Structure for Light Fixing Panels (Single / Double) Duly Shaped to Required Curvatures. Fabricated from MS Pipe MS Perforated Sheet and MS Plate, Painted with One Coat of Red Oxide Primer and Industrial Synthetic Enamel”

Completion Date: 01/08/2010

Supply and Installation of Solar Water Heaters and Installation of solar P.V. Panels

“Supply, Fabrication, Erection and Commissioning of Fire Retardant, Sound Proof Steel Sliding Door complete with Top and Bottom Track duly riveted / screwed complete with MS Perforated Sheet on One Side, Rockwool Filling for Sound Proofing wrapped in Fire Retardant Cloth duly Painted”

Completion Date: 01/08/2010

Fabrication and Supply of Fuel Storage Tanks

“This project included cutting of plates to required dimensions, rolling to required curvature, fabrication of shells/tanks/end plates, bending of angle iron for internal reinforcement, welding of tanks as per API 650, Dye Penetration Testing of welding, Pressure testing up to 7 psi, sand blasting internally/externally & epoxy coating fuel resistant internally and coal tar epoxy externally for bury”

Completion Date:01/05/2010

Supply and Fabrication of Fuel Storage Tanks

“This project was done for a joint venture of Louis Berger Group and Black and veatch for a 100 MW power plant in Kabul. The Steel structures were fabricated/manufactured in Islamabad and then transported to Kabul for Installation.”

Completion Date: 31/12/2009

Supply of Diesel Fuel Storage Tank.

“These were made for Perini Mangement Services Incorporated and supplied to their installation in Kabul. It was a6000 gallons fuel storage tank in accordance with API 650 complete in all respect dully pressure tested, sandblasted, epoxy coated. Supply includes the Access Platform, Ladder and Guard Railing etc. ”

Completion Date: 28/11/2005

Installation and Commissioning of 1500 Solar Homes in Tharparker, Sindh

“This was a project under the Roshan Pakistan Scheme. This project was aimed at providing access to electric lighting and means of communication to rural population.”

Completion Date: 12/06/2007

Supply and Fabrication of Fuel Oil Storage Tank.

“It was a 2000 gallons capacity diesel storage tank for WHO project at Islamabad duly tested, sand blasted and epoxy coated suitable for under ground installation. ”

Completion Date: 12/10/2005